Commercial Gas Connnection
Process for Commercial Gas Connection
Getting a commercial gas connection involves multiple steps. Below is a simplified flow:
1. Submission of Application
Submit required documents:
- Application form
- CNIC copy
- Property documents
- Layout map
- NOC (if required)
- NTN and business documents
2. Site Survey
SNGPL conducts a survey to check feasibility and calculate load requirements. If no pipeline exists nearby, the applicant may bear the installation cost.
3. Load Allocation
Head Office approves gas load based on survey results.
4. Demand Notice Issuance
If feasible, a demand notice is issued to the applicant.
5. Contract Signing
Applicant signs agreement and submits Houseline completion certificate.
6. Security Payment
Pay Security charges and Service line charges.
7. System Entry
Service agreement is entered into the computerized system.
8. Waiting Period
Connection is issued based on availability and queue.
9. Installation
Field team installs Gas meter and Service line.
10. Billing Starts
Monthly billing begins after installation.